Fitout Day 13: Let there be light, and water!

What a day! We got to quite a few milestones and ‘firsts’ today with the fitout, and it feels like we’re really starting to make progress.

We had a slight lie in after stoking up the stove, and then cooked hot cross buns from a local deli and bakery, Basilia, on the stove top, having bought the last 6 yesterday for 90p. Although the stove wasn’t quite hot enough to properly toast them, they were still very nice.

image

Then we set to the kitchen with a will. The first task was to cut the lengths of worktop that go along the wall to size. Other pieces over the sides of the U shaped kitchen, covering the fridge and with a cutout to support the cooker, will be added later. It was fairly exacting doing the measuring, and after measuring and checking no less than five times, I made the first cut with the new Bosch jigsaw I had bought yesterday, the B&Q value one I had used previously being neither particularly accurate or powerful. Having clamped a piece of wood along to act as a guide, I was able to cut it fairly quickly. Cutouts for the sink and for an oak beam in one corner of the work top followed, and we were soon able to screw the worktops in place. The kitchen was starting to come together nicely.

image

The next job was to attach some battens on the edge of e worktops for the sink to sit on. The sink is designed to be used with 38mm worktops, and supports itself on two overhangs over the sides of the worktop. Because our worktop was the significantly cheaper 28mm thick variety, it would not have properly fitted, but we thought of this and had bought a couple of 10mm square section strips, to put under the lips on the sides of the sink and support it at the right height.

image

Then it was a matter of attaching up the tap and sink waste to the fittings installed earlier. Simon’s father, Ron, had helpfully made up a fitting with a sea cock and a tee to put the sink wet and the pipe from the sump in the bathroom onto. Because our skin fitting isn’t a standard domestic size, we’ve had to use a temporary flexible plastic tube, designed for overflows, which should last until we can get some better tube to replace it. After a bit of faffing with tape and jubilee clips, the waste was waterproof and working well, so it was time for the moment of truth; mount the main supply cable to the electrical panel onto the battery terminal and turn on the water pump to see if any leaks appeared.

image

Whilst the inaccessible plumbing was mercifully leak free, the Paloma annoyingly was spurting water from a drain down valve with no plug in it, so we turned off the pipe, removed the Paloma- which we were going to do anyway to cut the hole in the roof- and put on a temporary stop end on the supply pipe, so we could use the tap and sink with cold water.

This time, when the pump was turned on, we were able to use the sink freely with no leaks. The inline Jabsco filter is working well, and the water is quite free from any taint or odour and quite nice to drink.

image

The next job was to make the hole in the roof for the Paloma to exhaust through. After carefully measuring the centre of the hole in the cabin lining, which had already been cut out, I drilled through from the inside, and was then able to use a piece of wood with a screw through one end and a pencil to mark out the radius of the circle I wanted to cut. It was heavy going cutting through the 4mm steel, but the drill made it, with the addition of WD40 as makeshift cutting oil to the holes every now and then. It took about an hour to drill 25 closely spaced holes around the circumference of the circle marked out on the roof, but unfortunately just as I was using the jigsaw to start to join the holes together and complete the cut, the HSS blade snapped. Whilst there is another one, somewhere on the boat, we couldn’t find it anyway, and with it being Easter Sunday, the shops were all shut so couldn’t get more.

We had a quick walk along the cut as the sun set, and then whilst Amy was cooking a simple pasta dinner on a portable camping stove- stored in the gas locker when not in use, I don’t trust the seal on the cartridges supplied- I connected up the LED light fitting I had put up yesterday, and we were able to have a nice bright light in the kitchen to wash up by. The kitchen now looks like a kitchen, and we’ve been able to remove the food, plates and bowls, and other domestic bits and pieces from the plastic crate where it had been stored and put them away in the kitchen cupboards.
image

As mentioned, several firsts today; first running water, first working permanently wired in lights, and, first proper meal cooked on board. Already the boat is starting to feel more homely and far less like spartan camping. OK hot water still needs to come from the top of the solid fuel stove in a pan, or from the kettle whilst on the shoreline, and we can only cook on a camping stove, but it’s much, much less basic than it was.

image

Advertisements
Categories: Fitout, Uncategorized | 7 Comments

Post navigation

7 thoughts on “Fitout Day 13: Let there be light, and water!

  1. James

    Great to hear you are getting on so well. The sink/worktop look great. When you get a new blade the roof should be quick to finish, when I did it on Shambles I only drilled 4 holes and used the saw for the rest so it should take you no time with 20+ holes. When are you getting underway?

    • Severner Willow

      Hopefully Wednesday. I did so many holes because I tried to cut a circle freehand in the back cabin roof, where the pump out-fitting-that-isn’t goes, and ended up getting into a bit of a mess, so played it safe. The packet of drill bits I used was bought from Mackays to use with your drill all those years ago when we were trying to remove Lucky Duck’s old flexible coupling, and ended up grinding it off! Willow has one of those couplings too, but the prop shaft is bolted in an R&D style flange to it, which is much less complicated.

  2. 1st cruise starting soon?

  3. It looks as though all is going well. You’ve managed to get a lot done. Hope all goes well when you start to move on Wednesday.

  4. Moving on Wednesday?

    Fab!

    I hope you have organised both captain’s chair and ukelele (essential perquisites to happy boating, I feel…..:-)

  5. Assorted candies such as candy corn, or m&ms (optional).
    The halftime show is a huge production, in which fans in the stadium often play a part,
    and which rivals a concert at just about any other venue.
    All it takes is creativity and a desire to offer healthy choices.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Create a free website or blog at WordPress.com.

%d bloggers like this: