Fitout 29

Last night we connected up the shower waste with a length of pipe so that we could fit the whole tray in place and eventually connect it up. The wood supports have been treated with end grain protector, and the wood is pressure treated exterior grade.

With a bit of wiggling and some difficulty we got the tray in place. It is very heavy so not easy to manoeuvre but we got there eventually. The sump box fits nicely next to it and so the next task is to attach all the pipes and the Gulper pump. Then we can begin making the shower cubicle!

20130628-143032.jpg

20130628-143100.jpg

Advertisements
Categories: Fitout | Leave a comment

Post navigation

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Blog at WordPress.com.

%d bloggers like this: